{"id":43044,"date":"2018-03-08T12:13:46","date_gmt":"2018-03-08T19:13:46","guid":{"rendered":"http:\/\/saitjournalism.ca\/?p=43044"},"modified":"2021-02-07T20:30:13","modified_gmt":"2021-02-08T03:30:13","slug":"john-ware-renovations-on-track-to-finish-by-spring","status":"publish","type":"post","link":"https:\/\/saitjournalism.ca\/thepress\/2018\/03\/08\/john-ware-renovations-on-track-to-finish-by-spring\/","title":{"rendered":"John Ware renovations on track to finish by spring"},"content":{"rendered":"<p>[dropcap]R[\/dropcap]enovation of the John Ware building at SAIT has been under way for the entire 2017-18 school year.<\/p>\n<p>SAIT&#8217;s stakeholders aim for it to be done by the end of the winter semester.<\/p>\n<p>Chris\u00a0Gerritsen, a spokesman for SAIT, \u00a0said in a recent interview that the project is running on time.<\/p>\n<p>\u201cIt\u2019s not a case of being behind schedule, we\u2019re on schedule,\u201d \u00a0said Gerritsen.<\/p>\n<p>\u201cOne thing about Calgary is, nothing is for sure when it comes to the weather.&#8221;<\/p>\n<p>The milder the weather is, the faster the work will be completed and may even allow for landscaping to be done earlier than expected.<\/p>\n<p>But the winter of 2018 has been generally cold, and very snowy.<\/p>\n<p>SAIT began renovations on the John Ware for both cosmetic and age concerns, and as part of an ongoing commitment to improving the campus for both the students and staff.<\/p>\n<figure id=\"attachment_43052\" aria-describedby=\"caption-attachment-43052\" style=\"width: 615px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-43052\" src=\"http:\/\/saitjournalism.ca\/wp-content\/uploads\/2018\/02\/20180208-S2-SAIT-Construction-PD-0008-2-1.jpg\" alt=\"\" width=\"615\" height=\"410\" \/><figcaption id=\"caption-attachment-43052\" class=\"wp-caption-text\">Scaffolding between the John Ware and Begin Tower buildings at SAIT, Calgary, Alberta Thursday, Feb. 8, 2018. (Photo by Patrick Davies\/The Press)<\/figcaption><\/figure>\n<p>\u201cIt\u2019s important to note that change is good,\u201d said Gerritsen, encouraging students to embrace this change no matter how inconvenient it may be.<\/p>\n<p>Luis Parisi is a resident living on campus and a second-year culinary student who has had classes in John Ware for the last two years. He is in favour of the renovations.<\/p>\n<p>Parisi described crumbling concrete in some parts of the building and said he suspects the floors of the kitchen are no longer up to code, but having been approved previously, they\u2019re still legal.<\/p>\n<p>\u201cIt was crappy, the outside looked like a haunted building,\u201d said Parisi.<\/p>\n<p>He said that during the construction, diesel fumes from the site often found their way inside and linger due to the poor circulation that comes from three of its main entrances being blocked off.<\/p>\n<p>As of mid-February, according to\u00a0Parisi, work was focused on the exterior of the building. Work inside hadn&#8217;t started, and Parisi things the interior may not be finished by the end of the school year, in April.<\/p>\n<p>\u201cThe outside will probably be done by end of (the school year), but the inside will take much longer,\u201d said Parisi. \u201cIn my opinion, I think the inside should have been done before the outside.\u201d<\/p>\n<figure id=\"attachment_43050\" aria-describedby=\"caption-attachment-43050\" style=\"width: 615px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-43050\" src=\"http:\/\/saitjournalism.ca\/wp-content\/uploads\/2018\/02\/20180208-S2-SAIT-Construction-PD-0014.jpg\" alt=\"\" width=\"615\" height=\"410\" \/><figcaption id=\"caption-attachment-43050\" class=\"wp-caption-text\">Construction workers converse while on the John Ware Building construction site at SAIT on Thursday, Feb. 8, 2018. (Photo by Patrick Davies\/The Press)<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><p>Construction on the John Ware building, which has been under way throughout the 2018-18 school year, is on time and should be done by this spring, a SAIT spokesman says. <a class=\"mh-excerpt-more\" href=\"https:\/\/saitjournalism.ca\/thepress\/2018\/03\/08\/john-ware-renovations-on-track-to-finish-by-spring\/\" title=\"John Ware renovations on track to finish by spring\">[ READ MORE ]<\/a><\/p>\n<\/div>","protected":false},"author":431,"featured_media":43045,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"image","meta":{"_ef_editorial_meta_text_assignment-slug":"S2 John Ware Construction ","footnotes":""},"categories":[2],"tags":[110,174,1324,1007,612,617,634],"class_list":{"0":"post-43044","1":"post","2":"type-post","3":"status-publish","4":"format-image","5":"has-post-thumbnail","7":"category-campus-2","8":"tag-calgary","9":"tag-construction","10":"tag-john-ware-building","11":"tag-sait","12":"tag-weather","13":"tag-winter","14":"tag-yyc","15":"post_format-post-format-image"},"_links":{"self":[{"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/posts\/43044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/users\/431"}],"replies":[{"embeddable":true,"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/comments?post=43044"}],"version-history":[{"count":12,"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/posts\/43044\/revisions"}],"predecessor-version":[{"id":43795,"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/posts\/43044\/revisions\/43795"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/media\/43045"}],"wp:attachment":[{"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/media?parent=43044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/categories?post=43044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/saitjournalism.ca\/thepress\/wp-json\/wp\/v2\/tags?post=43044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}